User’s Manual—SNAP™ 600 Printer
95
Installation Procedure – Rear Assembly
1. Assemble Sensor Mounting Bracket to Sensor body with (2) 6-32 x ¼
Button Head Screws.
MCB POWER CABLE CONNECTOR
SENSOR MOUNTING BRACKET
(4) 10-32 X 1/4 BUTTON HEAD SCREWS
SENSOR
2. Remove (2) plastic Jam Nuts from Sensor, slide of ends of “Y” Cable and
secure with (2) 7/32 “E” Clips.
3. Insert the threaded Plastic Nuts into the Sensor receptacles, firmly
seating the Fiber-Optic Cable ends and tighten the Plastic Nuts.
7/32 E-RING
FIBER OPTIC CABLE END ("Y" END)
PLASTIC NUT
SENSOR
4. Assemble the Sensor / Bracket / Lead Assembly to the Upright Frame
using (2) Pem Nuts shown above. Use 10-32 x ¼ Button Head Screws
supplied with kit.
5. Assemble Sensor Power Cable to Sensor and plug into MCB Connector
labeled “Option Top Color / Contrast”.
Comments to this Manuals